BACKFLOW BASE

Backflow Base / Tester certification / Test procedures / SVB

SVB test procedure, step by step.

Spill-resistant pressure vacuum breaker assembly (SVBA). Check holds 1.0 psid or more. Air inlet opens at 1.0 psid or more.

Last updated .

Before you test: N.I.I.O.

Notify, Identify, Inspect and Observe, in that order, before a hose goes on.

Notify

On an SVB:

Identify

On an SVB:

Inspect

On an SVB:

Observe

On an SVB:

TC is a test cock. SOV is a shut-off valve. psid is pounds per square inch, differential.

Pressurizing the gauge

  1. REMOVE the canopy.
  2. FLUSH the test cock.
  3. FLUSH the vent valve by loosening the screw slightly, then re-tightening it.
  4. ATTACH the bleed-off valve arrangement to the high hose, then attach it to the TC.
  5. PRESSURIZE the gauge by opening the TC. Open the high bleed needle valve to purge air from the gauge, make a puddle of water on top of the air inlet to help judge the air inlet opening point, then close the high bleed needle valve.

Check valve test

The static pressure differential across the check valve must be at least 1 psid.

  1. CLOSE shut-off #2.
  2. POSITION the gauge with its centerline at the same height as the assembly's vent valve.
  3. CLOSE shut-off #1.
  4. OPEN the vent valve by slowly loosening and removing the screw completely, to lower the pressure in the body to atmospheric. Watch the gauge, and record the value if the air inlet opens at this point.
  5. READ the gauge when the flow from the vent valve stops or is no more than a slight drip. The reading is the differential pressure across the check valve. If the water does not stop, see troubleshooting: this indicates a shut-off leak.
    Record the static value as the pressure differential across the check valve.

Air inlet opening

The air inlet must open before the pressure in the body is no less than 1 psi above atmospheric pressure. Keep the gauge at the height of the vent valve.

  1. OPEN the high bleed needle valve slowly, no more than ¼ turn, so the gauge reading doesn't drop too fast.
  2. OBSERVE the gauge reading when the air inlet valve opens: water begins to flow from the vent valve opening.
  3. CLOSE the high bleed needle valve and remove the high side hose from the bleed-off valve arrangement to drain water from the body. Observe that the air inlet has fully opened.
    Record the air inlet opening point (must be 1 psid or greater).
  4. CLOSE the TC and the vent valve.
  5. OPEN shut-off #1 first, then slowly open shut-off #2, replace the canopy, and complete the test report.

Failure matrix

What can go wrong at each step, what it means, and what goes on the report.

StepYou seeIt meansResultNext
9Air inlet opens while the vent valve is being openedThe air inlet opening point has been reachedRecordRecord that reading as the air inlet opening point.
10Water keeps running from the vent valveShut-off #1 is leakingCheckUse the bleed-off valve arrangement to get a slight drip at the vent. See troubleshooting.
10Check reads below 1.0 psidDirty or damaged check disc, damaged seat, or a leaking diaphragm or sealCheck failsRecord the reading; clean or repair and retest.
11Gauge will not drop with the high bleed needle valve openShut-off #1 is leakingCheckUse the bleed-off valve arrangement to divert the leak.
12Air inlet opens below 1.0 psidDirty or damaged air inlet discAir inlet failsRecord the reading; clean or repair and retest.
12Gauge falls to 0.0 psid and the air inlet never opensDisc stuck to the seat, broken or missing spring, a leaky #2 shut-off on a parallel install, or it is a PVBAir inlet failsRecord it. Confirm the assembly type.
13Air inlet does not open fully when the hose is removedAir inlet disc stickingAir inlet failsRecord it; clean or repair and retest.

Troubleshooting an SVBA

Many problems are corrected by cleaning the internal components. Carefully observe the condition of the components. Shut-off valves can be re-opened and closed for a better seal. Use lubricants only to help reassemble components, and only non-toxic ones.

ProblemPossible causes
Air inlet valve does not open, as the gauge drops to 0.0 psidAir inlet disc stuck to seat
Broken or missing air inlet spring
Parallel installation with a leaky #2 shut-off valve
It is a PVB, not an SVB
Air inlet valve does not open, and the gauge reading will not dropLeaky #1 shut-off valve (use the bleed-off valve arrangement)
Air inlet opens below 1.0 psidDirty or damaged air inlet disc
Check valve reading below 1.0 psidDirty or damaged check disc
Damaged seat
Leaking diaphragm or seal
Water runs continuously from the vent valve (test #2)Leaky #1 shut-off valve (use the bleed-off valve arrangement to get a slight drip at the vent opening)

Other assemblies

All test procedures →

The software

Contact

hello@backflowbase.com