Backflow Base / Tester certification / Test procedures / PVB
PVB test procedure, step by step.
Pressure vacuum breaker assembly (PVBA). Air inlet opens at 1.0 psid or more. Check holds 1.0 psid or more.
Last updated .
Before you test: N.I.I.O.
Notify, Identify, Inspect and Observe, in that order, before a hose goes on.
Notify
- Tell the owner or whoever is on site that water past the assembly is about to go off, and for how long.
- Ask what is on the line before you close a valve: anything that cannot lose water or pressure, such as dialysis, boilers, medical or process equipment, livestock waterers or fire protection.
- Notify the water system too, if its program asks for notice before a test.
On a PVB:
- Most PVBs feed irrigation. Ask the owner to keep the controller from starting a zone while you test.
- The air inlet will spill water when it opens. Warn anyone nearby.
Identify
- Copy make, model, size and serial number off the assembly itself, not off last year's report. A swapped assembly is a new record.
- Record where it is on the premises.
- Confirm the assembly type matches the hazard the water system assigned to this connection.
- Confirm it is on the USC Foundation list of approved assemblies for the way it is installed.
On a PVB:
- A PVB protects against backsiphonage only. Confirm nothing downstream can create backpressure.
Inspect
- Inspect before you touch a valve. An assembly that is the wrong type, or installed wrong, fails no matter how it gauges.
- Both shut-off valves operate and hold.
- No visible leaks, cracks or freeze damage.
- Your test kit is in calibration. Most water systems want it calibrated within the last 12 months.
On a PVB:
- Installed vertically and upright.
- At least 12 in. above the highest downstream outlet or point of use.
- Canopy in place, air inlet clear and vent screen intact.
- Both test cocks present, operable and not plugged.
Observe
- Watch the assembly at rest before you start: discharge, drips and noise all tell you something.
- Watch for thermal expansion on a closed system: a water heater downstream of a closed shut-off can spike the pressure.
On a PVB:
- Is water spitting from the air inlet at rest? That points to a dirty or worn air inlet seat.
- Look downstream for anything that could push pressure back: a booster pump, a chemical injector or piping higher than the PVB. Any of these means the wrong assembly.
TC is a test cock. SOV is a shut-off valve. psid is pounds per square inch, differential.
Pressurizing the gauge
- REMOVE the canopy.
- FLUSH both test cocks.
- ATTACH the bleed-off valve arrangement to the #1 TC. Attach the high hose to the #2 TC.
- PRESSURIZE the gauge by opening the #2 TC. Open the high bleed needle valve to purge air from the gauge, then close the high bleed needle valve.
- CLOSE shut-off #2.
- POSITION the gauge with its centerline at the same height as the assembly's air inlet.
Air inlet opening
The air inlet must open before the pressure in the body of the PVB is no less than 1 psi above atmospheric pressure.
- CLOSE shut-off #1.
- OPEN the high bleed needle valve no more than ¼ turn. If the gauge will not descend with the valve open ¼ turn, shut-off #1 may be leaking: see troubleshooting.
- OBSERVE the pressure differential on the gauge at which the air inlet opens.
- DETACH the gauge hose to let the water drain from the body of the assembly. Observe that the air inlet has fully opened.
Record the air inlet opening point (must be 1 psid or greater). - CLOSE the high bleed needle valve.
- CLOSE the #2 TC.
- OPEN shut-off #1.
- ATTACH the high side hose to the bleed-off valve arrangement on the #1 TC.
- PRESSURIZE the gauge by opening the #1 TC. Open the high bleed needle valve to purge air from the gauge, then close the high bleed needle valve.
- POSITION the gauge with its centerline at the same height as the assembly's #2 TC.
Check valve test
The static pressure differential across the check valve must be at least 1 psid.
- CLOSE shut-off #1.
- OPEN the #2 TC and wait for the water to stop running. If it does not stop, see troubleshooting: this indicates a shut-off leak.
Record the static value as the pressure differential across the check valve. - CLOSE the TCs, detach the gauge, slowly restore customer service (open SOV #1 first, then slowly open SOV #2), replace the canopy, and complete the test report.
Failure matrix
What can go wrong at each step, what it means, and what goes on the report.
| Step | You see | It means | Result | Next |
|---|---|---|---|---|
| 8 | Gauge will not descend with the high bleed needle valve open ¼ turn | Shut-off #1 is leaking | Check | Divert the leak through the #1 TC with the bleed-off valve arrangement. See troubleshooting. |
| 9 | Air inlet opens below 1.0 psid | Dirty or damaged air inlet disc, scale on the seat, or a damaged spring | Air inlet fails | Record the reading; clean or repair and retest. |
| 9 | Gauge falls to 0.0 psid and the air inlet never opens | Disc stuck to the seat, broken or missing spring, an old non-loaded PVB, or it is an SVB | Air inlet fails | Record it. Confirm the assembly type. |
| 10 | Air inlet does not open fully when the hose is detached | Air inlet disc sticking | Air inlet fails | Record it; clean or repair and retest. |
| 18 | Water keeps running from the #2 TC | Shut-off #1 is leaking | Check | Adjust the bleed-off valve on the #1 TC for a slight drip at the #2 TC. |
| 18 | Check reads below 1.0 psid | Dirty or damaged check disc or seat, or a damaged spring | Check fails | Record the reading; clean or repair and retest. |
Troubleshooting a PVBA
Many problems are corrected by cleaning the internal components. Carefully observe the condition of the components. Shut-off valves can be re-opened and closed for a better seal. Use lubricants only to help reassemble components, and only non-toxic ones.
| Problem | Possible causes |
|---|---|
| Air inlet valve does not open, as the gauge reading drops to 0.0 psid | Air inlet disc stuck to seat Broken or missing air inlet spring "Old style" pressure vacuum breaker (non-loaded air inlet valve) It is an SVB |
| Air inlet valve does not open, and the gauge reading will not drop | Leaky #1 shut-off valve (use the #1 TC to divert the leak) Parallel installation with a leaky #2 shut-off valve |
| Air inlet opens below 1.0 psid | Dirty or damaged air inlet disc Scale buildup on seat Damaged spring |
| Check valve reading below 1.0 psid | Dirty or damaged check disc or seat Damaged spring |
| Water runs continuously from the #2 TC (test #2) | Leaky #1 shut-off valve (adjust the bleed-off valve arrangement to a slight drip at the #2 TC) |
Other assemblies
- RPZ test procedure →Reduced-pressure principle backflow assembly (RPBA)
- Double check test procedure →Double check valve assembly (DCVA)
- SVB test procedure →Spill-resistant pressure vacuum breaker assembly (SVBA)
The software
- Bookings from a booking page, your own website, and an AI receptionist on your phone.
- Schedule board and route for each tester.
- Field app that scores every test, even with no signal.
- Test reports sent to the water system that serves each address.
- Card payments to your own Stripe account, and yearly renewals that charge after the test.
- Client portal for HOAs, property managers and contractors.
- $50/month flat: no per-test fee, no cut of payments.
- Every feature →What the app does, part by part.
- Compare →Next to other backflow and field-service software.
- Start free →No card. $50/month or $500/year once you go live, 45 days free.
- Free exam prep →Study questions, practice exams, device tests, a VR wet lab.