Pressure vacuum breaker assembly (PVBA). Air inlet opens at 1.0 psid or more. Check holds 1.0 psid or more.

Last updated .

Before you test: N.I.I.O.

Notify, Identify, Inspect and Observe, in that order, before a hose goes on.

Notify

On a PVB:

Identify

On a PVB:

Inspect

On a PVB:

Observe

On a PVB:

TC is a test cock. SOV is a shut-off valve. psid is pounds per square inch, differential.

Pressurizing the gauge

  1. REMOVE the canopy.
  2. FLUSH both test cocks.
  3. ATTACH the bleed-off valve arrangement to the #1 TC. Attach the high hose to the #2 TC.
  4. PRESSURIZE the gauge by opening the #2 TC. Open the high bleed needle valve to purge air from the gauge, then close the high bleed needle valve.
  5. CLOSE shut-off #2.
  6. POSITION the gauge with its centerline at the same height as the assembly's air inlet.

Air inlet opening

The air inlet must open before the pressure in the body of the PVB is no less than 1 psi above atmospheric pressure.

  1. CLOSE shut-off #1.
  2. OPEN the high bleed needle valve no more than ¼ turn. If the gauge will not descend with the valve open ¼ turn, shut-off #1 may be leaking: see troubleshooting.
  3. OBSERVE the pressure differential on the gauge at which the air inlet opens.
  4. DETACH the gauge hose to let the water drain from the body of the assembly. Observe that the air inlet has fully opened.
    Record the air inlet opening point (must be 1 psid or greater).
  5. CLOSE the high bleed needle valve.
  6. CLOSE the #2 TC.
  7. OPEN shut-off #1.
  8. ATTACH the high side hose to the bleed-off valve arrangement on the #1 TC.
  9. PRESSURIZE the gauge by opening the #1 TC. Open the high bleed needle valve to purge air from the gauge, then close the high bleed needle valve.
  10. POSITION the gauge with its centerline at the same height as the assembly's #2 TC.

Check valve test

The static pressure differential across the check valve must be at least 1 psid.

  1. CLOSE shut-off #1.
  2. OPEN the #2 TC and wait for the water to stop running. If it does not stop, see troubleshooting: this indicates a shut-off leak.
    Record the static value as the pressure differential across the check valve.
  3. CLOSE the TCs, detach the gauge, slowly restore customer service (open SOV #1 first, then slowly open SOV #2), replace the canopy, and complete the test report.

Failure matrix

What can go wrong at each step, what it means, and what goes on the report.

StepYou seeIt meansResultNext
8Gauge will not descend with the high bleed needle valve open ¼ turnShut-off #1 is leakingCheckDivert the leak through the #1 TC with the bleed-off valve arrangement. See troubleshooting.
9Air inlet opens below 1.0 psidDirty or damaged air inlet disc, scale on the seat, or a damaged springAir inlet failsRecord the reading; clean or repair and retest.
9Gauge falls to 0.0 psid and the air inlet never opensDisc stuck to the seat, broken or missing spring, an old non-loaded PVB, or it is an SVBAir inlet failsRecord it. Confirm the assembly type.
10Air inlet does not open fully when the hose is detachedAir inlet disc stickingAir inlet failsRecord it; clean or repair and retest.
18Water keeps running from the #2 TCShut-off #1 is leakingCheckAdjust the bleed-off valve on the #1 TC for a slight drip at the #2 TC.
18Check reads below 1.0 psidDirty or damaged check disc or seat, or a damaged springCheck failsRecord the reading; clean or repair and retest.

Troubleshooting a PVBA

Many problems are corrected by cleaning the internal components. Carefully observe the condition of the components. Shut-off valves can be re-opened and closed for a better seal. Use lubricants only to help reassemble components, and only non-toxic ones.

ProblemPossible causes
Air inlet valve does not open, as the gauge reading drops to 0.0 psidAir inlet disc stuck to seat
Broken or missing air inlet spring
"Old style" pressure vacuum breaker (non-loaded air inlet valve)
It is an SVB
Air inlet valve does not open, and the gauge reading will not dropLeaky #1 shut-off valve (use the #1 TC to divert the leak)
Parallel installation with a leaky #2 shut-off valve
Air inlet opens below 1.0 psidDirty or damaged air inlet disc
Scale buildup on seat
Damaged spring
Check valve reading below 1.0 psidDirty or damaged check disc or seat
Damaged spring
Water runs continuously from the #2 TC (test #2)Leaky #1 shut-off valve (adjust the bleed-off valve arrangement to a slight drip at the #2 TC)