Double check test procedure, step by step.

Double check valve assembly (DCVA). Each check holds 1.0 psid or more.

Last updated .

Before you test: N.I.I.O.

Notify, Identify, Inspect and Observe, in that order, before a hose goes on.

Notify

On a double check:

Identify

On a double check:

Inspect

On a double check:

Observe

On a double check:

TC is a test cock. SOV is a shut-off valve. psid is pounds per square inch, differential.

Pressurizing the gauge

  1. FLUSH TCs #1, #2, #3 and #4. Attach a sight tube to the #3 TC if it does not rise above the #1 check valve.
  2. ATTACH the bleed-off valve arrangement to the high hose, then attach it to the #2 TC.
  3. PRESSURIZE the gauge by opening the #2 TC. Open the high bleed needle valve to purge air from the gauge, then close the high bleed needle valve.
  4. FILL the sight tube (if attached) by opening the #3 TC, then close the #3 TC.

Check valve #1 test

The static pressure differential across check valve #1 must be at least 1 psid.

  1. CLOSE shut-off #2.
  2. POSITION the gauge at the appropriate level. With a sight tube, hold the gauge so the water level in the tube is at the centerline of the gauge. Without one, hold the gauge centerline at the same height as the #3 TC.
  3. CLOSE shut-off #1.
  4. OPEN the #3 TC and wait for the water to stop running. If it does not stop, see troubleshooting: this indicates a shut-off leak.
    Record the static value as the pressure differential across check valve #1.
  5. CLOSE the #2 TC.
  6. CLOSE the #3 TC.
  7. OPEN shut-off #1 to re-pressurize the assembly.
  8. ATTACH a sight tube to the #4 TC if it does not rise above the #2 check valve.
  9. ATTACH the high hose, with the bleed-off valve arrangement attached, to the #3 TC.
  10. PRESSURIZE the gauge by opening the #3 TC. Open the high bleed needle valve to purge air from the gauge, then close the high bleed needle valve.
  11. FILL the sight tube (if attached) by opening the #4 TC, then close the #4 TC.

Check valve #2 test

The static pressure differential across check valve #2 must be at least 1 psid.

  1. POSITION the gauge at the appropriate level. With a sight tube, hold the gauge so the water level in the tube is at the centerline of the gauge. Without one, hold the gauge centerline at the same height as the #4 TC.
  2. CLOSE shut-off #1.
  3. OPEN the #4 TC and wait for the water to stop running. If it does not stop, see troubleshooting: this indicates a shut-off leak.
    Record the static value as the pressure drop across check valve #2.
  4. CLOSE the TCs, detach the gauge, slowly restore customer service (open SOV #1 first, then slowly open SOV #2), and complete the test report.

Failure matrix

What can go wrong at each step, what it means, and what goes on the report.

StepYou seeIt meansResultNext
8Water keeps running from the #3 TCShut-off #1 is leaking, or #2 is leaking with backpressureCheckOpen the bleed-off valve at the #2 TC and adjust for a slight drip at the #3 TC. See troubleshooting.
8Water recedes into the #3 TC#2 check and shut-off #2 are leaking, with demand downstream#2 check failsLower the gauge to the assembly centerline and record the #1 reading. Repair.
8#1 check reads below 1.0 psid#1 check is weak or fouled#1 check failsRepair before testing the #2 check.
18Water keeps running from the #4 TCShut-off #1 is leakingCheckOpen the bleed-off valve at the #3 TC and adjust for a slight drip at the #4 TC. See troubleshooting.
18Water recedes into the #4 TCShut-off #2 is leaking, with demand downstreamRecordLower the gauge to the assembly centerline, record the #2 reading, note shut-off #2 leaks.
18#2 check reads below 1.0 psid#2 check is weak or fouled#2 check failsRecord the reading; clean or repair and retest.

Troubleshooting a DCVA

Many problems are corrected by cleaning the internal components. Carefully observe the condition of the components. Shut-off valves can be re-opened and closed for a better seal. Use lubricants only to help reassemble components, and only non-toxic ones.

ProblemWhat to do
Water flows from the #3 TC (#1 check test)Observe the gauge reading. Open the bleed-off valve arrangement at the #2 TC and watch it.
  • If water flows continuously from the bleed-off valve arrangement, try to adjust it until there is a slight drip at the #3 TC. If you can, record the gauge reading as the differential pressure for check #1 and note that shut-off #1 is leaking. At 1.0 psid or greater, go on to test the #2 check. Below 1.0 psid, the #1 check valve must be repaired before going on.
  • If you can't slow the water at the #3 TC to a slight drip, SOV #1 is leaking too much and must be repaired. If the same thing happens after the repair, repair the #1 check valve, the #2 check valve and SOV #2.
  • If water does not keep flowing from the bleed-off valve arrangement but still flows from the #3 TC, record the observed reading as the pressure drop across the #1 check valve. Record the #2 check valve as leaking and SOV #2 as leaking with backpressure. Repairs are needed before going on.
Water recedes from the #3 TC (#1 check test)The #2 check valve is leaking and SOV #2 is leaking with demand downstream. Move the gauge down to the centerline of the assembly and record the pressure differential across the #1 check valve. Repairs are needed.
Water flows from the #4 TC (#2 check test)Observe the gauge reading. Open the bleed-off valve arrangement at the #3 TC and watch it.
  • If water flows continuously from the bleed-off valve arrangement, try to adjust it until there is a slight drip at the #4 TC. If you can, record the gauge reading as the differential pressure for check #2 and note that shut-off #1 is leaking. The test is complete.
  • If you can't slow the water at the #4 TC to a slight drip, re-check the tightness of shut-off #1. If the bleed-off valve arrangement still can't slow it to a slight drip:
    • If the #1 check valve held 1.0 psid or more in the first test, close the bleed-off valve arrangement and open the #2 TC. Record the gauge reading as the differential across the #2 check valve. If water still flows from the #4 TC, it is backpressure through a leaking SOV #2, because all of the shut-off #1 leak is being diverted out the #2 TC.
    • If water does not keep flowing from the bleed-off valve arrangement but still flows from the #4 TC, record the observed reading as the pressure drop across the #2 check valve. Record the #2 check valve as tight and SOV #2 as leaking with backpressure. Repairs are needed.
Water recedes from the #4 TC (#2 check test)SOV #2 is leaking and there is demand downstream. Move the gauge down to the centerline of the assembly and record the pressure differential across the #2 check valve. Note that SOV #2 leaks.

Other assemblies